Monthly Archives: August 2015

Day 50- on the trawler and headed to RHYC 


       

Posted in Uncategorized | Leave a comment

Day 49-trip down the creek for dinner


       

Posted in Uncategorized | Leave a comment

Unsticking hydraulic steering cylinder


               

Posted in Uncategorized | Leave a comment

Flushing Teleflex steering system and cleaning Model 50 Uniflow Valve


                    

Posted in Uncategorized | 2 Comments

Day 48-launching whaler and headed to breakfast at Hard Yacht


          

Posted in Uncategorized | Leave a comment

A beautiful morning on Bear Creek. 


  

Posted in Uncategorized | Leave a comment

Fill’er up. 22 gallons


     

Posted in Uncategorized | Leave a comment

Averaged less then 2 mpg towing the tube thus a tow by moonlight to the boat ramp. 


       

Posted in Uncategorized | Leave a comment

Two of three kids completed the Great Triangle Before the sunset. 


  

Posted in Uncategorized | Leave a comment

Tubbing the Triangle- final leg Tangier to Crisfield


       

Posted in Uncategorized | Leave a comment

Final leg of the 30+ mile tubing triangle


       

Posted in Uncategorized | Leave a comment

Tangier Island Sunset


          

Posted in Uncategorized | Leave a comment

Southern tip of Tangier Island


                 

Posted in Uncategorized | Leave a comment

Heading to the south end of Tangier


                 

Posted in Uncategorized | Leave a comment

A second round of ice cream from Four Brothers


  

Posted in Uncategorized | Leave a comment

More wandering around Tangier


                 

Posted in Uncategorized | Leave a comment

Spanky’s for ice cream


     

Posted in Uncategorized | Leave a comment

Wandering around the town


               

Posted in Uncategorized | Leave a comment

Parks Marina- Tangier Island


     

Posted in Uncategorized | Leave a comment

The east channel heading to Tangier 


                    

Posted in Uncategorized | Leave a comment